Case Study

Glasgow Skypark

Client: SVM Consulting Engineers

Start Date: 27/08/2012

Completion Date: 30/11/2012

Value: £160,000

Scope of Works:

A comfort cooling system was installed throughout the three wings of the 5th floor consisting of ceiling and wall mounted indoor units and roof mounted external condenser units. A new switch panel was installed to provide the electrical requirements of the new equipment. A new fully addressable fire alarm system was installed throughout the floor and integrated into the main system.