Client: ISG
Start Date: November 2015
Completion Date: September 2017
Value: £3.5m

Scope of Works:

Transforming the previous Hanover building from an office building into a 7 storey, 145 bedroom, compact hotel in the middle of Edinburgh’s new town. This project included all mechanical, electrical and plumbing.

Mechanical and Plumbing services

Individual VRF units to bedrooms and comms rooms with full leak detection and refrigerant pump down system.
Leak detection of underfloor services.
Roof mounted Plant and Ventilation distribution.
Full Cast Iron Rainwater and Drainage
Complex Multi service risers
Sanitary ware and FFE equipment
Full Unvented Water System comprising – Gas Fired Heaters
Gas safety System, associated plant and equipment.
16,000 ltr Water tank and booster set.
Full co-ordination of multi services using Revit and full modelling software.
Full commissioning and certification of all systems

Electrical Installation
 
                        
LV Switchgear and distribution
Multi Containment Systems
Fire alarms, security, CCTV, Disabled Refuge
Data cabling
Lighting and Small Power
VDA integrated bedroom control system and complex LV, comms, coaxial and control cabling distribution.
Lightning Protection