Case Study

John Anderson Building

Client: John Anderson Building

Start Date: 17/09/2012

Completion Date: 30/11/2012

Value: Confidential

Scope of Works:

After reducing the laboratory area to a shell a new electrical system consisting of lighting and small power was
installed to meet the clients requirements. A fume Cupboard was installed within the laboratory and
was ducted up through the building to the rood where it terminated to a stacked outlet.




 