Case Study

Scottish Power - Kirkintilloch

Replacement of existing main switchgear within a live data centre

Contract Value:
£600,000

The installation consisted of the installation of 2no new 1000a UPS switchboards, 1no 1000a generator swtchboard, 1no 1000a main switchboard, 2no 630a PDU's and 1no 1000kva standby generator. The existing installation consisted of 630a switchboards which were disconnected and removed without the loss of power to the existing data equipment within the main data hall.

The installation works were phased to ensure no loss of power throughout the works.The installation also consisted of installing new parallel supplies to each of the data cabinets located within the main data hall.