Construction of rebound therapy room and gymnasium refurbishment
Value: £305,000
Works within the Rebound Therapy room included
- Full Strip Out
- Blockwork walls lined with fire protection boards and specialist padded panels
- Ceiling formed with concrete beam and block system to give 2hr fire protection
- Trampoline installation incl. Diamond Cutting through existing concrete floor slab to form aperture and formation of pit
- New fire protection for exposed steelwork
- Installation of distribution board, small power, ventilation and sensory lighting / audio system
- 200kg Manual Traverse Hoist
- New A/C and ventilation system
- Decoration
Gymnasium works included
- Removal of existing ceiling and lights and replacement with new suspended ceiling and LED lights
- Removed areas of bossed floor screed and replaced
- Installation of aluminium external doors
- Supply of new gym equipment
In order minimise the impact of our works on both the pupils and ongoing school operations, the project was carried out over a very tight programme during the summer holiday shut down and at weekends.